current view | home > projects > St. Johnsbury, VT - 0.5 MG Clearwell
|
0.5 MG CLEARWELL
ST. JOHNSBURY, VERMONT
The 3.0 million gallon per day (mgd) Saint Johnsbury Water Treatment Facility was
constructed in 1990 with a 0.146 MG in-plant clearwell. The limited operating volume
of the clearwell required frequent on/off operation of the treatment facility, which is detrimental
to finished water quality and increased color and particle counts in the finished
water. The new clearwell project includes constructing a 0.5 million gallon (mg) clearwell
at the former site of the east alum residuals lagoon at the existing water treatment
facility. The east alum lagoon was be abandoned during this project. The additional
storage volume will improve finished water quality and is anticipated to result in decreased
disinfectant byproducts. The design was completed in November of 2008 and
construction is scheduled for October of 2009.
KEY FEATURES
- Designs plans included for two tank alternatives (precast-prestressed concrete and
bolted panel glass fused to steel) to maximize bidding competition.
- The clearwell construction increases the water system hydraulic gradeline by 37 ft
(15 psi) and a new pressure reducing valve vault was necessary to reduce the
possibility of damage within the distribution system that could occur as a result of
the pressure increase.
- Site work included chemical feed improvements to
extend the potassium permanganate feed line to a
location near the raw water intake.
- The remaining alum residuals lagoon was renovated
to allow process waste to normally discharge to a
slip-lined main which will convey the waste to the St.
Johnsbury Wastewater Treatment Facility (WWTF).
The renovation included constructing two pre-cast
concrete process waste holding tanks and reshaping
the remaining lagoon area to serve as a separate
waste holding area when discharge to the WWTF is
limited or not allowed.
|