PROJECT INFORMATION

The WESTSIDE INFRASTRUCTURE IMPROVMENTS PROJECT has been set forth to improve the failing infrastructure within a large portion of St Johnsbury, VT.

The following key items are integral to this project:
  • Replace undersized water main
  • Install new water services
  • Install new fire hydrants
  • Clean and Line a portion of water main on Prospect Street and Thadeus Lane
  • Replace the existing combined sewer system (which now overflows into Sleeper's Brook) with separate sanitary sewer and stormwater systems.
  • Install new sewer services to the Town right-of-way
  • Install new stormwater connection points at the Town right-of-way to facilitate connections from private stormwater such as from roof drains, etc.
  • Construct new sidewalks with granite curbing
  • Construct new roadways
  • Construct new retaining walls