DUFRESNE GROUP ASSISTING THE TOWN OF LITTLETON, NH WITH WATER AND WASTEWATER STUDIES
03.17.16
Dufresne Group is assisting the Town of Littleton and Littleton Water and Light Department with evaluations of certain areas of the wastewater and water system. DG assisted the Town in obtaining a USDA Rural Development Grant to provide 75% grant funding for evaluation of the wastewater collection system. The wastewater study will determine improvements necessary to minimize the inflow and infiltration of stormwater and groundwater into the sanitary sewer collection system. In addition, DG is working with Littleton Water and Light to provide assistance in assessing their 9-mile long water transmission main. The transmission main was installed in 1903 and has provided reliable service to customers for over a century. Given the age and importance of the transmission main, we are working with Littleton Water and Light to determine the condition of the main and provide recommendations for any necessary improvements. We are pleased to work with the Town of Littleton and the Littleton Water and Light Department to provide planning and design engineering for this vibrant municipality.