 Roger Ward acting as Resident Project Representative for the project.
For over two decades the City of Montpelier planned
construction of a surface water treatment facility to produce
potable drinking water from the Berlin Pond source. After
numerous site relocations during preliminary design, the
construction of a state of the art 4.0 million gallons per day
water treatment facility was initiated in 1998.
DG provided construction consulting services during the 620
calendar day construction period, which concluded in June
2000. These services included:
- Engineering Services Negotiations
- On-Site Construction Observation
- Process Engineering Consultation
- Operator Training
- Facility Startup/Demonstration of Operational
Readiness
- Operation and Maintenance Manual Development
- Source Protection Plan Development
- Ongoing Operational Assistance
KEY FEATURES:
- $400,000 reduction in engineering fees
- Significant construction issues including a small site, 30,000 CY of ledge blasting and excavation, extensive yard piping with sizes up to 48-inches diameter
- Continuous on-site demonstration of operational readiness consultation
- Customized operator training
|