![]() ![]() |
current view | home > projects > Leominster, MA - Water System Study & Master Plan |
CITY OF LEOMINSTER, MASSACHUSETTES The City imposed a moratorium on municipal water connections in 1999 as a result of drought conditions. During the drought, one of the sources of supply was depleted to the extent that water had to be drawn from a separate service area. Dufresne Group created a computer model of the Leominster water system using Pipe 2000 software. The computerized hydraulic model was used as a tool to develop recommended improvements to the water transmission distribution storage systems. The improvements plan will provide additional sources to areas with limited supply and allow removal of the current moratorium as well as provide sufficient capacity to meet future demands. Key Features:
|