WATER TREATMENT FACILITY UPGRADE
CLAREMONT, NEW HAMPSHIRE


New 0.6 million gallon clearwell

Based on the December 2004 basis of design (BOD) report prepared by Dufresne Group (DG), a Water Treatment Facility upgrade was undertaken to include the following:
  • Replace supervisory control and data acquisition system (SCADA)
  • Replace northside booster pumps and controls
  • Install hydrated lime storage and feed system
  • Install carbon dixide storage and membrane feed system
  • Install reinforced fabric baffle walls within the in-plant clearwell
  • Install a 0.6 million gallon baffled precast-prestressed concrete finished water clearwell


The construction was performed by T.Buck construction of Auburn, Maine for $3,440,500 and was substantially complete on February 27, 2008.