current view | home > projects > Claremont, NH - Water Treatment Facility Upgrade
|
WATER TREATMENT FACILITY UPGRADE
CLAREMONT, NEW HAMPSHIRE
 New 0.6 million gallon clearwell
Based on the December 2004 basis of design (BOD) report prepared by Dufresne Group (DG), a Water Treatment Facility upgrade was undertaken to include the following:
- Replace supervisory control and data acquisition system (SCADA)
- Replace northside booster pumps and controls
- Install hydrated lime storage and feed system
- Install carbon dixide storage and membrane feed system
- Install reinforced fabric baffle walls within the in-plant clearwell
- Install a 0.6 million gallon baffled precast-prestressed concrete finished water clearwell
The construction was performed by T.Buck construction of Auburn, Maine for $3,440,500 and was substantially complete on February 27, 2008.
|