current view | home > projects > Claremont, NH - WTF Filter Renovations
|
WATER TREATMENT FACILITY FILTER RENOVATIONS
CLAREMONT, NH
 Plant Operator, Tom Burnham, adjusts filter settings.
Dufresne Group (DG) completed a filter media pilot investigation at the Claremont Water
Treatment Plant in an attempt to document the treatment capabilities of the existing filters. The
results showed that the existing filters, if renovated, would produce up to 4.0 mgd of water in
accordance with State and Federal Standards. The pilot testing also documented that the
renovated GAC filter could function as a filtration treatment process in the event the primary sand
filter had to be taken off line. This finding indicated a substantial savings by negating the need for
a complete filter replacement project. The construction costs for the filter upgrade using the
current technology as compared to new filters was estimated as follows:
- Replace Existing Filters with New Filters: $5,400,000
- Renovate Traveling Bridge Filters: $ 650,000
- SAVINGS: $4,750,000
The City of Claremont and the State of New Hampshire accepted this recommendation and D&A
competed final design drawings and specifications. US Filter (a Siemens Company) was selected
as the low bidder at a bid price of $650,000.
D&A designed several enhancements to the traveling bridge filters to improve performance and
reliability and required a full scale demonstration test of operational readiness be performed prior
to acceptance by the City. After several tries, US Filter successfully completed the test and
demonstrated the filters could produce 4.0 mgd at levels far superior than allowed under State and
Federal requirements.
|