  |
|
|
|
|
current view | home > projects > Brattelboro, VT - Water Treatment Facility Upgrade
|
WATER TREATMENT FACILITY UPGRADE
BRATTLEBORO, VERMONT
The Brattleboro, Vermont Pleasant Valley Reservoir Water
Treatment Facility was originally constructed in 1988. Since
that time the facility has experienced difficulties with
coagulation and operation of the adsorption clarifier/filters.
The Town of Brattleboro initiated an evaluation of the facility
in 2000 to identify deficiencies and recommend
improvements. As a result of that evaluation the following
improvements were included in a comprehensive facility
upgrade:
- Increase raw water pipe diameter for additional
coagulation contact time.
- Building addition for equipment.
- Addition of a fourth clarifier/filter unit.
- Addition of filter rinse provisions.
- Building addition for air handling equipment, storage
and maintenance.
- Modification to existing lagoons.
- Construction of freezing/drying bed.
- Controls, instrumentation and SCADA replacement.
- Wide Area Network.
KEY FEATURES
- Significant reduction in
operating staff labor
requirements.
- Maintain facility flow and
uninterrupted supply to the
Town of Brattleboro during
construction.
- Annual and long term cost
savings for residuals
handling and disposal.
- Enhanced public health
protection by eliminating
potential turbidity spikes,
giardia or cryposporidium
contamination.
|