BASIS OF DESIGN REPORT FOR
MINARDS POND SURFACE WATER TREATMENT
BELLOWS FALLS, VERMONT
 DG in the News.
The Bellows Falls Basis of Design Report,
completed by Robert E. Dufresne while at
Dufresne-Henry, is a comprehensive water
system planning document that contains the
results of:
- Overall system hydraulic evaluations.
- Pilot investigations and corrosion control
studies.
- In depth analysis and comparisons of pulsating
upflow clarifier/ABW filter treatment and
adsorption clarification/mixed media filtration.
The recommended treatment system, “Trident”
package absorption clarifiers/mixed media filters
were constructed as part of a total project completed
in 1991. The basis of design process
components are distinguished by their recommendation
prior to the Water Supply Rule
enactment.
KEY FEATURES
- Filter to waste provisions installed well in
advance of regulatory requirlements.
- First implementation of SCADA
technology for a Vermont water treatment
facility.
- Chlorine dioxide disinfection.
- “Trident” package unit filtration.
- Potassium permanganate and PAC for
taste and odor control.
|