BASIS OF DESIGN REPORT FOR
SURFACE WATER TREATMENT
CITY OF BARRE, VERMONT


Bird's eye view of the Barre water treatment facility.

A comprehensive evaluation of the Barre water system treatment, storage and transmission distribution piping system was completed by Dufresne Group principals as a project while employed at Dufresne-Henry. The Basis of Design Report for the Barre water treatment facility contained the following specific analyses:
  • Source evaluation and improvements investigations.
  • Comprehensive hydraulic investigations of the completed
  • water system including in depth computer modeling.
  • Storage tank sizing and siting evaluation.
  • Alternative treatment process comparison.
  • Service area delineation for setting water system connection policies.

The recommendations for water treatment were implemented with the 1992 construction of a 6.0 MGD treatment plant. The City of Barre continues to rely on the Basis of Design report for planning of storage and piping system improvements.

KEY FEATURES
  • Identification of long term water main improvements for providing fire flow protection.
  • Water storage evaluation for correcting system hydraulic deficiencies and providing for future needs.
  • Proactive planing for THM control by recommending chlorine dioxide and PAC treatment.
  • Additional barriers of protection and filtration criteria recommend in excess of regulating requirements.